Friday, 2 November 2012

Delivering CCi Live


In Thursday’s studio practice we still had very little media from the production group for us to work with. We used their script but we were unsure if it was the latest version. Unfortunately we were unable to run through the whole show because of these issues as well as the time we spent sorting out the Tricaster to do what we needed.

On the morning of the live show, we were gradually provided with the remaining content that we needed. When we ran through the show, the duration was quite short of the required 30 minutes, meaning we would have to stretch certain parts as much as possible. This took the form of slower speaking sections, an additional news story being added that had been taken away, and more ad-lib between presenters.

In the end, the show’s final duration was 6 seconds short. Unfortunately there was an issue with the sound during the live interview. We were unaware that the 3rd microphone had been taken out of the Tricaster so the interviewee’s sound was only being picked up slightly by the presenter’s own microphones. During an insert we asked one of our presenters to apologise for the technical issue when the insert finished, thereby acknowledging that a mistake was made, whether it was our fault or not.

Here are some photo's from the day







Interview that had sound problems


CCi Live - 02/11/2012

No comments:

Post a Comment